CELL SITE AT 1292; BODEX SULEJA, NIGER.

CONTRUCTION OF MTN BTS

Construction of a reinforced concrete retaining wall (1.2m High). Construction of generator and shelter plinths. Formation of granite finish apron Installation of palisade steel fence with razor coil around the perimeter of site. Site cleanup and hand over

Year:                                                             2008

Project Location:                                         Suleja

Client:                                                           MTN Nigeria Limited

Contractor:                                                   Plessey Nigeria Limited

Sub-Contractor:                                           Brogg Engineering Nig. Ltd

CELL SITE AT 1121; ASO DELIGHT, ABUJA.

CONSTRUCTION OF MTN BTS

Construction of a reinforced concrete retaining wall (3m High) Construction of generator and shelter plinths. Formation of granite finish apron Installation of palisade steel fence with razor coil around the perimeter of the site. Site clean-up and hand over:

Year:                        2008

Location:                Abuja

Client:                     MTN Nig Ltd

Contractor:            Plessey Nig Ltd

Sub-Contractor:    Brogg Engineering Nig. Ltd

CELL SITE AT 1046; HUAWEI TRAINING SCHOOL, ABUJA.

CONSTRUCTION OF MTN BTS

Construction of 1m concrete cubes on rooftop. Felting of concrete cubes. Installation of antenna Formation of granite finish apron Installation of palisade steel fence with razor coil around perimeter of site. Site cleanup and hand over

Year:                        2009

Location:                Abuja

Client:                     MTN Nig Ltd

Contractor:            Plessey Nig Ltd

Sub-Contractor:    Brogg Engineering Nig. Ltd

CELL SITE 777; NIPOST AIYETORO,OGUN STATE

CONSTRUCTION OF MTN BTS

Construction of reinforced concrete retaining wall. Tower Foundation and erection. Construction of generator and shelter plinths. Shelter assembly and reticulation. Formation of granite finish apron. Installation of palisade steel fence with razor coil around perimeter of site. Site Cleanup and Hand Over

Year:                        2009

Location:                Ogun

Client:                     MTN Nig Ltd

Contractor:          Likusasa Limited

Sub-Contractor:    Brogg Engineering Nig. Ltd

CONSTRUCTION AND INSTALLATION OF

350KVA ATS DUAL SYSTEM

Design of an Automatic Transfer Switch (600Amps)

Construction of 600amps ATS. Construction of generator and ATS plinths. Installation of ATS. Site Clean-up and Hand Over

Year:                        2008

Location:                Bauchi  

Client:                    MTEL

Contractor:            John Holt Eng

Sub-Contractor:    Brogg Engineering Nig. Ltd

CELL SITE T3372; OSARENWATA,EDO STATE

PHCN INSTALLATION AND COMMISSIONING FOR MTN BTS

Site survey and preparation of TSS report. Application to PHCN for necessary permits. Make payment of statutory fee to PHCN

Transport of Equipment and materials to site Installation of Transformers and other materials. Hook-up, energize and testing/commissioning. Meter application and Installation.

Year:                        2013

Location:                Benin

Client:                     MTN Nig Ltd

Contractor:           Huawei Limited

Sub-Contractor:    Brogg Engineering Nig. Ltd

IN ORE AND BENIN UNDER MTN IBADAN REGION.

INTEGRATED MAINTENANCE SERVICES (SIMS) FOR 97

Generator Maintenance. ATS Maintenance. AVR Maintenance. AC Electrical Wiring and Connection. Janitor cleaning of all BTS sites. Tower Member Maintenance

Mechanical maintenance of Equipment house (shelter), fence and Air conditioner.

Year:                        2013

Location:                Ibadan Region

Client:                     MTN Nig Ltd

Contractor:          JMG Limited

Sub-Contractor:    Brogg Engineering Nig. Ltd

CELL SITE T3258, IDIABE ROAD GRA, EDO STATE.

INSTALLATION AND COMMISSIONING FOR MTN BTS

Site survey and preparation of TSS report. Application to PHCN for necessary permits. Make payment of statutory fee to PHCN

Transport of Equipment and materials to site. Installation of Transformers and other materials. Hook-up, energize and testing/commissioning. Meter application and Installation.

Year:                        2013

Location:                Benin

Client:                     MTN Nig Ltd

Contractor:         Huawei Limited

Sub-Contractor:    Brogg Engineering Nig. Ltd

CELL SITE ED2002; PIEDMONTH,EDO STATE

INSTALLATION AND COMMISSIONING FOR MTN BTS

Site survey and preparation of TSS report. Application to PHCN for necessary permits. Make payment of statutory fee to PHCN. Transport of Equipment and materials to site. Installation of Transformers and other materials. Hook-up, energize and testing/commissioning. Meter application and Installation.

Year:                        2013

Location:                Benin

Client:                     MTN Nig Ltd

Contractor:          Huawei Limited

Sub-Contractor:    Brogg Engineering Nig. Ltd