CELL SITE AT 1292; BODEX SULEJA, NIGER.
CONTRUCTION OF MTN BTS
Construction of a reinforced concrete retaining wall (1.2m High). Construction of generator and shelter plinths. Formation of granite finish apron Installation of palisade steel fence with razor coil around the perimeter of site. Site cleanup and hand over
Year: 2008
Project Location: Suleja
Client: MTN Nigeria Limited
Contractor: Plessey Nigeria Limited
Sub-Contractor: Brogg Engineering Nig. Ltd
CELL SITE AT 1121; ASO DELIGHT, ABUJA.
CONSTRUCTION OF MTN BTS
Construction of a reinforced concrete retaining wall (3m High) Construction of generator and shelter plinths. Formation of granite finish apron Installation of palisade steel fence with razor coil around the perimeter of the site. Site clean-up and hand over:
Year: 2008
Location: Abuja
Client: MTN Nig Ltd
Contractor: Plessey Nig Ltd
Sub-Contractor: Brogg Engineering Nig. Ltd
CELL SITE AT 1046; HUAWEI TRAINING SCHOOL, ABUJA.
CONSTRUCTION OF MTN BTS
Construction of 1m concrete cubes on rooftop. Felting of concrete cubes. Installation of antenna Formation of granite finish apron Installation of palisade steel fence with razor coil around perimeter of site. Site cleanup and hand over
Year: 2009
Location: Abuja
Client: MTN Nig Ltd
Contractor: Plessey Nig Ltd
Sub-Contractor: Brogg Engineering Nig. Ltd
CELL SITE 777; NIPOST AIYETORO,OGUN STATE
CONSTRUCTION OF MTN BTS
Construction of reinforced concrete retaining wall. Tower Foundation and erection. Construction of generator and shelter plinths. Shelter assembly and reticulation. Formation of granite finish apron. Installation of palisade steel fence with razor coil around perimeter of site. Site Cleanup and Hand Over
Year: 2009
Location: Ogun
Client: MTN Nig Ltd
Contractor: Likusasa Limited
Sub-Contractor: Brogg Engineering Nig. Ltd
CONSTRUCTION AND INSTALLATION OF
350KVA ATS DUAL SYSTEM
Design of an Automatic Transfer Switch (600Amps)
Construction of 600amps ATS. Construction of generator and ATS plinths. Installation of ATS. Site Clean-up and Hand Over
Year: 2008
Location: Bauchi
Client: MTEL
Contractor: John Holt Eng
Sub-Contractor: Brogg Engineering Nig. Ltd
CELL SITE T3372; OSARENWATA,EDO STATE
PHCN INSTALLATION AND COMMISSIONING FOR MTN BTS
Site survey and preparation of TSS report. Application to PHCN for necessary permits. Make payment of statutory fee to PHCN
Transport of Equipment and materials to site Installation of Transformers and other materials. Hook-up, energize and testing/commissioning. Meter application and Installation.
Year: 2013
Location: Benin
Client: MTN Nig Ltd
Contractor: Huawei Limited
Sub-Contractor: Brogg Engineering Nig. Ltd
IN ORE AND BENIN UNDER MTN IBADAN REGION.
INTEGRATED MAINTENANCE SERVICES (SIMS) FOR 97
Generator Maintenance. ATS Maintenance. AVR Maintenance. AC Electrical Wiring and Connection. Janitor cleaning of all BTS sites. Tower Member Maintenance
Mechanical maintenance of Equipment house (shelter), fence and Air conditioner.
Year: 2013
Location: Ibadan Region
Client: MTN Nig Ltd
Contractor: JMG Limited
Sub-Contractor: Brogg Engineering Nig. Ltd
CELL SITE T3258, IDIABE ROAD GRA, EDO STATE.
INSTALLATION AND COMMISSIONING FOR MTN BTS
Site survey and preparation of TSS report. Application to PHCN for necessary permits. Make payment of statutory fee to PHCN
Transport of Equipment and materials to site. Installation of Transformers and other materials. Hook-up, energize and testing/commissioning. Meter application and Installation.
Year: 2013
Location: Benin
Client: MTN Nig Ltd
Contractor: Huawei Limited
Sub-Contractor: Brogg Engineering Nig. Ltd
CELL SITE ED2002; PIEDMONTH,EDO STATE
INSTALLATION AND COMMISSIONING FOR MTN BTS
Site survey and preparation of TSS report. Application to PHCN for necessary permits. Make payment of statutory fee to PHCN. Transport of Equipment and materials to site. Installation of Transformers and other materials. Hook-up, energize and testing/commissioning. Meter application and Installation.
Year: 2013
Location: Benin
Client: MTN Nig Ltd
Contractor: Huawei Limited